Published figures for resurfacing a Pretoria or Centurion pool run from about R17,300 to R80,000 depending on size and who is quoting. One Gauteng operator quotes three to five days between drain and refill, which is not the date you can swim. Below: cost, timing, finishes, safety and preparation.
Before you read on
The questions below come up again and again before a pool is renovated. When a topic needs more room, follow the link to its page.
Published pool prices vary a lot between sources. Where they disagree, we show both rather than pick one.
Still have a question?
Send a request with your question in the notes, and we'll ring you.
Prefer to talk? Call 060 086 9889. If we miss you, leave your name and we'll return your call.
Sources for the figures on this page
- Marbelite R450 to R700 per m²; 38 to 95 m² pools R17,300 to R66,500; surface and extras priced separately; VAT not stated; compiled October 2026 (Crispy Pools, operator) crispypools.co.za
- Concrete pool resurfacing R25,000 to R80,000; VAT not stated; labelled 2026 (Quick Pools, quoting service) quickpools.co.za
- Coping work cheaper May to August; labelled 2026 (Quick Pools) quickpools.co.za
- Three to five days drain to refill (a construction figure, not a swimming clearance); enquiries drop May to August, book September; fibreglass finish; no date, 2026 footer (Trademen Pools) trademenpools.co.za
- Marbelite 6 to 8 mm thick www.marbelitepools.co.za
- Fill, brushing 14 days, cover 28 days on the filled pool, no copper or metal sulphates; never walk in before filled; one finish maker's guide, the installed product's instructions control www.marbelitepools.co.za
- Never mix acid and chlorine; keep children and pets away from chemicals www.cdc.gov